Baseball/Soccer/Softball/Rec Center Design | The Boneyard

Baseball/Soccer/Softball/Rec Center Design

Status
Not open for further replies.
Joined
Mar 24, 2012
Messages
17,535
Reaction Score
36,436
Latest conceptual plans for Baseball/Soccer/Softball/Recreation Center starts on page 9 of Planning Architectural Engineering Department September 9, 2015 update. Looks pretty impressive.



http://paes.uconn.edu/Project_Updates090915.pdf

They do look impressive, but the drawings don't show lights at any of the fields. Soccer will surely have lights, and I hope baseball does as well.
 
Joined
Dec 25, 2011
Messages
7,188
Reaction Score
8,765
Latest conceptual plans for Baseball/Soccer/Softball/Recreation Center starts on page 9 of Planning Architectural Engineering Department September 9, 2015 update. Looks pretty impressive.



http://paes.uconn.edu/Project_Updates090915.pdf

Very nice, thanks. Couple of comments. First, the overall sports complex looks impressive, like something found at a B1G school and not a AAC school, even if I disagree with the location of the new soccer stadium. Second, why on earth did I go to UConn in the 1990's and not the 2020's? How many times has Grant/MSB been rebuilt since it was constructed in the late 1970's Cripes. Also, any bet that the Mansfield locals will try to block digging a new water main through town to campus as a way to try and cap UConn's growth? Lastly, nice of UConn to wait to close Putnam Cafeteria until the spring as walking down the hill to North Campus, the Student Union, of McMahon for meals in the winter would suck!
 
Status
Not open for further replies.

Online statistics

Members online
113
Guests online
2,324
Total visitors
2,437

Forum statistics

Threads
155,752
Messages
4,030,457
Members
9,864
Latest member
leepaul
Top Bottom